Pit Zone Tent Setup

General Setup Activities

Canopy Tents (day before – part one)

  1. Expand four white canopy tents, being careful not to tear the fabric at the top (velcro corners prior to extending tent)
  2. Place rubber plate weights at all four corners of the combined tent setup as well as each of the four midpoints (between corners)

Student Area (day before)

  1. Expand four red collapsable benches and store soft cases back in trailer.
  2. Set up one white folding table with red table cloth on top.
  3. Place water jug (and any snacks, if already present) on top of table.
  4. Remove cow bells from blue plastic bin and place bells on table.

Coach/Bike Repair Area (day before)

  1. Expand blue Park Tool repair stand and store case back in trailer.
  2. Set up one white folding table with red table cloth on top.
  3. Place blue plastic bin under table.

Bike Storage Area (day before)

  1. Set up four Feedback Sports bike stands and store soft cases back in trailer.

Canopy Tents (day before – part two)

  1. Drop tents to mid-point configuration prior to leaving for the evening to prevent wind gust damage.

Day Of Final Setup

  1. Raise tents to full height and verify weight plates in proper positioning.
  2. Remove tire pump, shock pump, black roll tool bag, spare tubes, and tubeless sealant from blue plastic bin and place on tools table, place blue plastic bin back under table.
  3. Ensure water, snacks, cowbells, etc still on student table.

20′ x 20′ Tent Layout