General Setup Activities
Canopy Tents (day before – part one)
- Expand four white canopy tents, being careful not to tear the fabric at the top (velcro corners prior to extending tent)
- Place rubber plate weights at all four corners of the combined tent setup as well as each of the four midpoints (between corners)
Student Area (day before)
- Expand four red collapsable benches and store soft cases back in trailer.
- Set up one white folding table with red table cloth on top.
- Place water jug (and any snacks, if already present) on top of table.
- Remove cow bells from blue plastic bin and place bells on table.
Coach/Bike Repair Area (day before)
- Expand blue Park Tool repair stand and store case back in trailer.
- Set up one white folding table with red table cloth on top.
- Place blue plastic bin under table.
Bike Storage Area (day before)
- Set up four Feedback Sports bike stands and store soft cases back in trailer.
Canopy Tents (day before – part two)
- Drop tents to mid-point configuration prior to leaving for the evening to prevent wind gust damage.
Day Of Final Setup
- Raise tents to full height and verify weight plates in proper positioning.
- Remove tire pump, shock pump, black roll tool bag, spare tubes, and tubeless sealant from blue plastic bin and place on tools table, place blue plastic bin back under table.
- Ensure water, snacks, cowbells, etc still on student table.
20′ x 20′ Tent Layout